USC Capital Construction and Development (CCD) recently modified traffic lanes on Alcazar Street as part of the ongoing HSC Beautification Project. The modifications will be in place through May to accommodate sidewalk and street construction on the south side of Alcazar between San Pablo and Soto streets.
Employees entering the campus from Soto Street are encouraged to use Norfolk Street as an alternate to Alcazar Street. In order to maintain two-way traffic in the affected areas, parking meters will be taken down and “Tow Away No Stopping Any Time” signs will be posted.
An additional LADOT Traffic Control Officer will be located on Alcazar Street at the back entrance to the Keck Hospital Parking structure (UHP) from 6:30 to 8:30 a.m. Other Traffic Control Officers will continue to assist with rush hour traffic control at the intersections of San Pablo and Alcazar; Eastlake and San Pablo; and Zonal and San Pablo streets. In addition, LADOT-approved traffic control measures will be in place throughout the project to assist vehicles and pedestrians approaching the area. For more information, contact USC CCD at hscbeaut@usc.edu.